Rapid pH Compliance Recovery, Industrial Wastewater, Dallas

Sthealth Integrators restored a non-compliant industrial wastewater system to stable, audit-passing pH control in just three days through rapid, field-ready controls engineering under emergency conditions.
Compliance
Industrial Wastewater
24/7 Response

Overview

Project overview and insights

An industrial wastewater facility in Dallas faced escalating regulatory risk after repeatedly failing pH compliance audits due to an unstable, partially implemented neutralization system with undocumented modifications. Sthealth Integrators responded within 24 hours, performing hands-on field engineering, validating undocumented controls, and rapidly programming and commissioning the PLC and HMI without relying on existing drawings or manuals. Within three days, the system was fully stabilized, passed audit immediately, and restored operational confidence—demonstrating Sthealth Integrators’ ability to deliver decisive, compliance-critical automation under tight timelines.